From: [123I]FP-CIT ENC-DAT normal database: the impact of the reconstruction and quantification methods
SBR % difference quantification method | Southampton—BRASS | |
---|---|---|
IRNC | ACSC | |
Pre calibration (impact of PVE) | 96.0 | 95.9 |
Post calibration (expected = 0) | 25.7 | 33.9 |